Treatment Plan for Archaeological Resources Within the Interstate 10 Corridor Improvement Project, Tangerine Road to the I-19 Interchange

A treatment plan and research design are outlined for 35 significant archaeological sites previously known from surface surveys and subsurface testing, as well several probable subsurface sites that have not yet been located.

$5.00
Read more$20.00

Out of stock

$5.00$20.00

SKU: TR1993-02G Category:

Description

Treatment Plan for Archaeological Resources Within the Interstate 10 Corridor Improvement Project, Tangerine Road to the I-19 Interchange (TR1993-2)

A treatment plan and research design are outlined for 35 significant archaeological sites previously known from surface surveys and subsurface testing, as well several probable subsurface sites that have not yet been located.

Author / Editor: Jonathan B. Mabry

51 pages, 3 figures