Final Report on Phased Archaeological Data Recovery at the Boulder Bend Site, AZ W:16:7 (ASM)/AR-03-01-03-233 (ASNF), Arizona State Route 78, Milepost 169.91- 170.16, Greenlee County, Arizona (TR2008-9) (PDF)

Final Report on Phased Archaeological Data Recovery at the Boulder Bend Site, AZ W:16:7 (ASM)/AR-03-01-03-233 (ASNF), Arizona State Route 78, Milepost 169.91- 170.16, Greenlee County, Arizona (TR2008-9) (PDF)

Edited by: Michael W. Diehl

Contributions by: Jenny L. Adams, M. L. Brack, Michael W. Diehl, James M. Heidke, Carlos P. Lavayan, R. Jane Sliva

Downloadable PDF – 27 pages

$5.00

SKU: TR2008-09D Categories: ,

Description

Final Report on Phased Archaeological Data Recovery at the Boulder Bend Site, AZ W:16:7 (ASM)/AR-03-01-03-233 (ASNF), Arizona State Route 78, Milepost 169.91- 170.16, Greenlee County, Arizona (TR2008-9) (PDF)

Phased archaeological data recovery for a proposed ADOT realignment of approximately 0.3 miles of State Route 78 at a sharp curve. Following construction of the new alignment, the old roadway will be obliterated, and two culverts removed. Data recovery required 53 non-supervisory person-days, 73 total person days.